Thursday, October 27, 2011

PR28-10-11. Progress Report from 22 to 28 Oct 2011



i.d works in bedroom


bracket for glass at both ends of covered-walkway

Thursday, October 20, 2011

PR21-10-11. Progress Report from 15 to 21 Oct 2011



installation of frosted film

installation of wardrobe in BR

landscape at front entrance

r.c ramp at walkway


steel works at main signage

Thursday, October 13, 2011

PR14-10-11. Progress Report from 8 to 14 Oct 2011


light for dining


A/c at guard-house

label for car-park lot

landscaping work at front entrance

Thursday, October 6, 2011

PR7-10-11. Progress Report from 1 to 7 Oct 2011



delivery of marble dining table


installation of shelving at Dining




cabinetry works at wet-kitchen/laundry

dismantling of shelve in 'Study'


revised landscaping at front car-park area


signage at main entrance

Thursday, September 29, 2011

PR30-9-11. Progress Report from 24 to 30 Sept 2011


revised s/s top & drawer for island counter


signage works beside media wall

skirting at dining

final paint works for revised fire escape door

revised model/model stand



replacement of plants at s/pool deck


installation of ID root works at Receiving pavilion & Sales gallery

landscape along retaining wall

Thursday, September 22, 2011

PR23-9-11. Progress Report from 17 to 23 Sept 2011


widening of fire escape door


revised works to wet-kitchen ceiling height


granite feature wall & landscape works along boundary/main entrance

delivery of dungeon root for main foyer

steel works progress (facing Leedon rd)

(facing Farrer rd)

final polishing of marble at revised dining

delivery of pendant light for dining